| 1. Floor panels are
prepared. |
2. Roof sections are
prepared. |
 |
 |
| 3. Panels & Sections
staged for shipping. |
4. Loading in progress. |
 |
 |
| 5. Shipment arrives to
jobsite. |
6.House has been
prepared for intallation. |
 |
 |
| 7. Floor is set. Walls
have windows pre-installed. |
8. Walls are set in
place. Note foam insulation. |
 |
 |
| 9. Roof Panels lifted. |
10. Roof Panels
installed. |